LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Acura >> 2011 >> ZDX >> Repair and Diagnosis >> Engine Performance >> System >> PCV System >> PCV Valve Replacement
April 5, 2026: LEMON Manuals is launched! Read the announcement.

PCV Valve Replacement

  1. Remove the engine cover (see step 1 on REMOVAL ).
  2. Lift up the engine harness holder (A).
    Fig 1: Engine Harness Holder, Bolt And PCV Valve With Torque Specifications
    G08073032Courtesy of AMERICAN HONDA MOTOR CO., INC.
  3. Remove the bolt (B).
  4. Remove the PCV valve (C).
    NOTE: Take care not to spill oil on the hot exhaust manifold.
  5. Install the parts in the reverse order of removal.
    NOTE:
    • When installing a new PCV valve, make sure the O-rings (D) are in place.
    • When installing a used PCV valve, use new O-rings.