Standard Procedure - Hoisting
CAUTION:
When positioning the vehicle on an arm lift, take into account that the power unit is located in the rear area.
CAUTION:
Failure to follow the Hoisting Procedure will result in body damage.
The ground clearance from the body side skirt to level ground is 110mm (3.5 inches). Most standard vehicle lift arms will not fit under the vehicle. In order to lift the vehicle and avoid vehicle damage, the vehicle must be lifted prior to attempting to lift the vehicle using a standard lift.
Use the recommended GOJAKS Jack dolly (ZEN4500 - Zendex GO JAK Jack/Dolly) to lift the vehicle at all four tires, then roll the vehicle into place to begin the lifting procedure.
- Position the lifts as shown in the figure.
Tool Name Function ZEN4500 - Zendex GO JAK Jack/Dolly Jack/Dolly Vehicle positioning on a lift - Operate the valve to adapt it to the dimension of the front wheel.
- Close the valve to lock the lift.
- Press the pedal to lift the vehicle and correctly position the lift arms.
- The vehicle lifting points are marked on the side skirts in the points indicated in the figure (1a), (1b).
- The support points for lifting the front part of the vehicle are shown in the figure.
- The support points for lifting the rear part of the vehicle are shown in the figure.