LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> BMW >> 1997 >> 528i Automatic >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control - Overview >> Ms41.1/Ms41.2 >> Power Supply >> Principle Of Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Principle Of Operation

Battery Voltage  is monitored by the ECM for fluctuations. It will adjust the output functions to compensate for a lower (11.7v) and higher (14v) voltage value. For example, the ECM will:

Fig 1: Identifying E39 Power Supplies Circuit
G03394097

The E39 Power Supplies  (KL15 and ECM Relay) are fused to the MS41.1 ECM.

The fuses are housed in the Engine Fuse Block located in the Electronics Box.

When KL15  is switched "on" the ECM is ready for engine management. The ECM will activate ground to energize the Engine Control Module Relay. The Engine Control Module Relay supplies operating voltage to the ECM and the previously mentioned operating components.

When KL15  is switched "off" the ECM operating voltage is removed. The ECM will maintain a ground to the Engine Control Module Relay for a few seconds.

Ground  is required to complete the current path through the ECM. The ECM also:

Fig 2: Identifying Engine Control Module Relay Circuit
G03394098