Steps in Isolating The Problem
- Use Test Modules.
- Perform electrical tests with the DISplus Measurement System or a DVOM.
- Consult fault charts in Repair or Diagnostic Procedures Articles.
- Control Module Self Diagnosis.
- Use appropriate special tools (e.g. battery draw tester, tank leakage adapters, breakout boxes, etc.).
- Substitute a known good part.
Workshop Hints:
If a TEST PLAN is not available for a particular situation do the following:
- Think about the system in its entirety.
- Be sure the normal operation is understood.
- Develop a PLAN.
- Use all available resources.
- Don't try to diagnose the entire system at once, break it into manageable chunks.
- Check the easy things first. It would waste time to install the Breakout Boxes to find a bad bulb.
When following a TEST PLAN:
- DON'T Skip steps.
- NEVER assume results without doing a step.
- Recheck your work.