Auxiliary Valve Body: Installation
Coat check ball with petroleum jelly before installation. Install check ball in auxiliary valve body. To complete installation, reverse removal procedure. Lubricate "O" ring with petroleum jelly. Install new filter and "O" ring. Tighten bolts to specification. See TORQUE SPECIFICATIONS table. Fill transmission with fluid.