Rectifier Bridge Test: Notes
NOTE:
Install NEW bearing at slip ring end whenever generator is reassembled. When disassembling generator, carefully note locations of insulated and uninsulated screws.
NOTE:
Some digital ohmmeters cannot be used to check diodes in rectifier bridge. Consult ohmmeter manufacturer to determine ohmmeter capabilities.