Installation Procedure
- Install the new gasket.
- Install the throttle body assembly (1).
- Install the throttle body bolts (5) and the nuts (4).
Tighten: Tighten the bolts and the nuts to 10 N.m (89 lb in).
- Connect the throttle body electrical connector.
- Install the air cleaner intake duct. Refer to Air Cleaner Inlet Duct Replacement .
- Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement .
- Fill the cooling system. Refer to Cooling System Draining and Filling (L26 Static Fill) or Cooling System Draining and Filling (L26 GE 47716 Fill) .
- Refer to Control Module References for programming and setup information.
CAUTION:
Refer to Fastener Caution
.