Installation Procedure
NOTE:
Do not use a cleaner which contains methyl ethyl ketone. This extremely strong solvent may damage components and is not necessary for this type of cleaning.
Use a carburetor cleaner in order to remove deposits.
Refer to the instructions provided with the cleaner.
Use a carburetor cleaner in order to remove deposits.
Refer to the instructions provided with the cleaner.
NOTE:
The outlet of the air cleaner assembly and the MAF sensor inlet duct must line up when completely installed. Misalignment may cause incorrect airflow readings resulting in MIL illumination or a driveability concern. An improperly installed inlet duct assembly or air cleaner assembly may cause misalignment.
IMPORTANT:
Do Not Reuse the old throttle body gasket.
- Install the accelerator cable bracket (3) to the throttle body (1).
Tighten: Tighten the bolts to 12 N.m (106 lb. in.).
- Position the new throttle body gasket on to the throttle body.
- Install bolts from the throttle body (3) to throttle body spacer (1) and finger tighten 2 lower bolts.
Tighten: Tighten all the bolts to 12 N.m (106 lb. in.).
- Install the IAC valve electrical connector (1) to the IAC valve (4).
- Install the TP sensor electrical connector (2) to the TP sensor (3).
- Install the accelerator control cable (3) at throttle body lever (2).
- Install the cruise control cable (2) at throttle body lever.
- Install the accelerator cable (3) to the accelerator controls cable bracket (1).
- Install the cruise control cable to accelerator controls cable bracket (1).
- Install the transaxle shift cable (1) clip to the accelerator controls cable bracket.
- Install the fuel feed and return lines from the retainer (5) on to the accelerator controls cable bracket.
- Install the air cleaner intake duct clamp to the air cleaner intake air duct.
Tighten: Tighten the air cleaner intake duct clamps to 3 N.m (27 lb. in.).
- Install the PCV valve fresh air tube.
- Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement .
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
- Perform the TP Sensor learn procedure.
- Turn ignition switch to the RUN/ON position.
- Wait 1 minute.
- Turn ignition switch to the LOCK/OFF position.
- Wait 15 seconds.
- Perform the IAC Valve learn procedure:
- Start and idle the engine for 15 seconds.
- Turn the ignition switch to the LOCK/OFF position.
- Wait 15 seconds
- Restart the engine, and check for proper idle operation.
NOTE:
Refer to Fastener Notice in Cautions and Notices.