Ignition Coil: Remove & Replace
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| In-Line4, All Four | 0.7 | C | ||
| In-Line4, One,Cyl #1-3 | 0.4 | C | ||
| In-Line4, One,Cyl #4 | 0.5 | C | ||
| Combination Procedure: SPARK PLUG TUBE SEAL: Remove & Replace: | ||||
| 2.0L Eng,Turbocharger, All Four | Includes:Drain and refill Low Temperature Cooling System. Includes: R&I Wiper Link Assembly & Cowl Top Panel. | 3.3 | C | |