LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 1990 >> APV >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly (Complete) >> Remove & Replace
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Assembly (Complete): Remove & Replace

Includes: R&I Engine Assembly. Transfer Fuel and Electrical Assemblies and Engine Mounts. DOES NOT include transfer of Manifolds, Valve Cover(s), Timing Cover(s), Oil Pan and/or Water Pump. NOTE: For bare Engine, refer to Long Block - R&R.

Applies ToNoteStandard HoursWarranty HoursSkill Level
11.0B
Additional Procedure: ENGINE ASSEMBLY (COMPLETE): Remove & Replace:
Where Air Cond interferes add1.0B
Where Cruise Control interferes add0.2B
Where Elect Eng System interferes add0.5B
Where Eng Oil Cooler interferes add0.4B
Where Pwr Stg interferes add0.4B
Where Trans Oil Cooler interferes add0.2B