LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2000 >> Blazer 2D Utility, 4WD, Automatic, Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
4WD,Automatic Trans29.6A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
w/Skid Plate add0.3A
Where Air Cond interferes add0.3A
Where Cruise Control interferes add0.2A
Where Eng Oil Cooler interferes add0.4A
Where Pwr Stg interferes add0.4A
Where Trans Oil Cooler interferes add0.2A
Combination Procedure: CAMSHAFT BEARING: Remove & Replace:
NOTE: This operation applies to full circle, resistance fit bearings only. For split cap type bearings use Camshaft - R&R.
Each0.3A
Combination Procedure: OIL PUMP: Overhaul:
0.6B
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.2A