Engine Assembly: Remove, Install, and Overhaul
WARNING: This page is about the Venture Base, Van Cargo Extended, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters.
Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 29.0 | A | |||
| Combination Procedure: CAMSHAFT BEARING: Remove & Replace: NOTE: This operation applies to full circle, resistance fit bearings only. For split cap type bearings use Camshaft - R&R. | ||||
| Each | 0.3 | A | ||
| Combination Procedure: OIL PUMP: Overhaul: | ||||
| 0.6 | B | |||
| Combination Procedure: ROCKER ARM STUD: Remove & Replace: | ||||
| Each | 0.2 | B | ||
| Combination Procedure: VALVE GUIDE: Remove & Replace: | ||||
| Each | 0.2 | A | ||