Installation Procedure
- Install the boost control solenoid (2).
- Install the boost control solenoid nut.
Tighten: Tighten the nut to 8 N.m (71 lb in).
- Connect the boost control solenoid electrical connector.
- Connect the boost source and signal hoses to the boost control solenoid (2).
- Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement in Engine Mechanical - 3.8L.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.