Installation Procedure
- Install a new O-ring.
- Apply a thin coat of oil to the O-ring.
- Install the fuel pressure regulator (5).
- Install the retaining bolts (1).
Tighten: Tighten the retaining bolts to 10 N.m (89 lb in).
- Install the throttle body. Refer to Throttle Body Assembly Replacement .
- Reconnect the fuel return line (2).
- Reconnect the vacuum line (4).
- Start the engine.
- Check for leaks and repair as necessary.
NOTE:
Refer to Fastener Notice in Cautions and Notices.