Installation Procedure
Courtesy of GENERAL MOTORS CORP.
- Install the shift lock solenoid (2) to the manual selector.
Courtesy of GENERAL MOTORS CORP.
- Install the shift lock solenoid cover (2).
- Connect the shift indicator lamp electrical connector and the shift lock solenoid connector (3) under the carpet.
- Install the shift indicator lamp (1).
Courtesy of GENERAL MOTORS CORP.
- Install the console box to the floor.
- Secure the console box with the 2 plastic retaining clips (2,5) and the 4 screws (1,6,3,4).
- Connect the negative battery cable.