LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2004 >> TrailBlazer 4.2 S, 4WD >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line6,4WD37.1A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
w/Air Cond1.10.7A
w/Skid Plate add0.30.2A
Combination Procedure: CYLINDER LINER: Remove & Replace:
Includes: Cylinder Liner Trimming.
In-Line6, Each0.80.6A