LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2007 >> Cutaway 6.6 2 >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Cutaway 4.8 V, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,Gas, w/Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.36.9A
V8,Gas, w/o Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.36.4A
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.2A