Component Testing
- Measure for 24-28 ohms of resistance between the terminals of the EVAP purge solenoid.
- If the resistance is not within the specified range, replace the EVAP purge solenoid.
- Test for infinite resistance between each terminal of the EVAP purge solenoid and the EVAP purge solenoid housing.
- If less than infinite resistance, replace the EVAP purge solenoid.