Installation Procedure
- Install the ECT and tighten to 20 N.m (15 lb ft).
- Connect the engine wiring harness electrical connector (3) to the ECT sensor.
- Install the heat shield around the electrical connector, if necessary.
- Fill the cooling system as needed. Refer to Cooling System Draining and Filling (Static Fill-LNF) .
CAUTION:
Refer to Fastener Caution
.