LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2013 >> Traverse LS, AWD >> Repair and Diagnosis >> Brakes >> Traction Control >> Antilock Brake System >> Diagnostic Information and Procedures >> DTC C0110 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

  1. Ignition OFF, disconnect the harness connector at the EBCM.
  2. Ignition OFF and all vehicle systems OFF. It may take up to 2 minutes for all vehicle systems to power down. Test for less than 10 Ω between the ground circuits listed below and ground:
    • Terminal 13
    • Terminal 38
    • If greater than the specified range, test the ground circuit for an open/high resistance.
  3. Ignition ON, verify that a test lamp illuminates between the B+ circuits listed below and ground.
    • Terminal 1
    • Terminal 25
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance. If the circuit tests normal and the B+ circuit fuse is open, replace the brake pressure modulator valve.
  4. If all circuits test normal, replace the brake pressure modulator valve.