Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Manual High Voltage Disable Method | Includes: R&I Timing Chain. Includes: Disable and Enable High Voltage System. | 20.6 | A | |
| Scan Tool High Voltage Disable Method | Includes: R&I Timing Chain. Includes: Disable and Enable High Voltage System. | 19.9 | A |