LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2021 >> Trailblazer L >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.2L EngIncludes: R&I Subframe Assembly. Includes: R&I Engine and Transmission Assembly. Includes: R&I Camshaft Cover w/Turbocharger together as an assembly. Includes: R&I Fuel Rail. Includes: R&I Fuel Injectors. Includes: R&I Camshafts. Includes: Drain and refill Cooling System. Includes: Drain and refill Transmission Fluid. Includes: Confirm Fluid temperature for level check. Includes: Drain and refill Engine Oil. Includes: Reset Oil Life Monitor. DOES NOT include Air Conditioning System recover, evacuate and recharge. DOES NOT include wheel alignment.19.1A
Combination Procedure: AIR INTAKE SYSTEM: Reset:
1.2L Eng, Intake System Learned Values ResetIncludes: Additional time for use of scan tool to perform this procedure.0.2B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B