Removal & Installation
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 1.2L Eng | Includes: R&I Air Cleaner. Includes: R&I Battery and Tray. Includes: R&I Muffler. Includes: R&I Subframe Assembly. Includes: R&I Axle Shafts. Includes: R&I Starter Assembly. Includes: Drain and refill Transmission Fluid. Includes: Confirm Fluid temperature for level check. DOES NOT include wheel alignment. | 8.7 | C | |
| Combination Procedure: CONVERTER: Drain & Test: | ||||
| 0.2 | C | |||
| Combination Procedure: CRANKSHAFT MAIN OIL SEAL: Remove & Replace: | ||||
| Rear,Oil Seal Housing | 0.5 | B | ||
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.2 | C | |||
| Combination Procedure: OUTPUT SHAFT SEAL: Remove & Replace: | ||||
| Each | 0.2 | B | ||
| Combination Procedure: TORQUE CONVERTER: Remove & Replace: | ||||
| 0.1 | C | |||
| Combination Procedure: TORQUE CONVERTER SEAL: Remove & Replace: | ||||
| 0.2 | B | |||
| Combination Procedure: TRANSMISSION ASSEMBLY: Replace: | ||||
| Includes: Programming. | 0.8 | C | ||
| Combination Procedure: TRANSMISSION OIL COOLER & LINES: Flush: Includes: Inspect for leaks and fluid flow test. | ||||
| 0.5 | C | |||