October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Starter Assembly: Remove, Install, and Overhaul
Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| In-Line4 | Includes: R&I Subframe.
DOES NOT include wheel alignment. | 7.6 | | B |
| Combination Procedure: STARTER FIELD COILS: Remove & Replace: |
| | 0.4 | | B |