LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 1997 >> LHS >> Repair and Diagnosis >> Electrical >> Starter >> Starting System >> On-Vehicle Testing >> Starter Relay Test
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Starter Relay Test

NOTE: Perform SOLENOID CIRCUIT TEST  before testing starter relay.

Remove starter relay from Power Distribution Center (PDC). Refer to PDC cover for proper relay location. PDC is located in engine compartment. Connect 12-volt power source to starter relay terminal No. 86 and ground terminal No. 85. See Fig 1. Using ohmmeter, check continuity across starter relay terminals No. 30 and 87. If continuity is not present, replace starter relay.

Fig 1: Identifying Starter Relay Terminals
G95F35282Courtesy of CHRYSLER CORP.