LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 1999 >> LHS >> Repair and Diagnosis >> Body & Frame >> Body, Cab Control Systems >> Body Control Computer >> Instrument Cluster Test 17C >> Parking Brake Switch Open Circuit
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Parking Brake Switch Open Circuit

NOTE: Perform INSTRUMENT CLUSTER TEST 17A  before proceeding with this test. For connector terminal identification and wiring diagrams, see BODY CONTROL COMPUTER - INTRODUCTION. Perform VERIFICATION TEST: VER-2A  after each repair.
CAUTION: Always turn ignition switch to OFF position prior to disconnecting or connecting any module connector.
  1. Disconnect parking brake switch connector. Connect jumper wire between ground and parking brake switch connector terminal. If parking brake light is illuminated, replace switch. If parking brake light is not illuminated, go to next step.
  2. With jumper wire connected, turn ignition off. Disconnect instrument cluster. Using external ohmmeter, measure resistance between ground and terminal No. 3 (Gray/Black wire) on instrument cluster Blue 10-pin connector C2. If resistance is less than 5 ohms, replace instrument cluster. If resistance is 5 ohms or greater, repair open Gray/Black wire.