LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2001 >> Intrepid Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 4 (Starting System) >> On-Vehicle Testing >> Disabling/Enabling Ignition & Fuel Systems >> Enabling Ignition & Fuel Systems
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Enabling Ignition & Fuel Systems

WARNING: This page does not describe the selected car, but rather 15 other vehicles, including the 2001 Plymouth Neon, 2001 Dodge Ram Wagon, 2001 Dodge Ram Van, 2001 Dodge Pickup, and 2001 Dodge Neon. However, it is still accessible from the selected car via links, so may be relevant.

When testing and/or repairs have been completed, verify battery condition. After starter tests have been completed, recharge battery as necessary. Disconnect all test equipment. Install Automatic Shutdown (ASD) relay. On 5.9L diesel engines, install fuel pump relay. On all models, start engine several times to verify malfunction has been corrected.