LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2002 >> Intrepid Base >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery System & Charging System >> Generator >> Installation >> Installation - 2.7L
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation - 2.7L

  1. Install generator.
  2. Install pivot bolt, leave loose.
  3. Connect the generator field circuit plug.
  4. Install the B+ terminal nut and wire and tighten to 9.8 N.m (85 +/- 15 in. lbs.).
  5. Install the generator drive belt. Refer to the GENERATOR/POWER STEERING BELT INSTALLATION .
  6. Adjusting T-bolt and tighten belt.
  7. Remove jackstand from under radiator and install lower radiator crossmember support.
  8. Reposition transmission cooler and tighten fasteners.
  9. Install lower plastic splash shield.
  10. Lower vehicle.
  11. Connect negative battery cable.

    Tighten all fasteners to the proper torque. Refer to SPECIFICATIONS - TORQUE .