Installation - 3.5L
- Install generator.
- Install the pivot bolt.
- Install the lower mounting bolt.
- Connect the B+ wire and tighten nut and tighten to 9.8 N.m (85 +/- 15 in. lbs.).
- Connect the generator field circuit connector.
- Install generator drive belt. Refer to GENERATOR/POWER STEERING BELT .
- Tighten the pivot bolt.
- Tighten the lower mounting bolt.
- Install the upper radiator support and tighten bolts.
- Connect the negative battery cable. Tighten all fasteners to the proper torque. Refer to the Torque Specifications chart in this section.