Drive Cycles
Manufacturer does not provide a specific drive cycle to run all the monitors. Performing Powertrain Verification Test VER-5 will run most of the monitors. See POWERTRAIN VERIFICATION TEST VER-5 under VERIFICATION TESTS. Verification tests are normally referred to after performing a code related diagnostic test. To run all the monitors, it may be necessary to perform more than one powertrain verification test. See appropriate POWERTRAIN VERIFICATION TEST under VERIFICATION TESTS.