Switchover Solenoid: Installation
- Position the air pump switchover solenoid (2) above air pump switchover solenoid mounting bracket (3) and lower until air pump switchover solenoid locking tab (1) snaps into place.
- Connect the vacuum lines (1).
- Connect the air pump switchover solenoid harness connector (2).
- Install the air cleaner housing.
- Connect the negative battery cable.