LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2006 >> Sebring GTC >> Repair and Diagnosis >> Electrical >> Starter >> Starting System >> Starting >> Diagnosis And Testing >> Diagnosis And Testing - Control Circuit Test >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Diagnosis And Testing - Control Circuit Test: Notes

The starter control circuit has:

  1. Starter motor with integral solenoid
  2. Starter relay
  3. Transmission range sensor or Park/Neutral Position switch with automatic transmissions
  4. Ignition switch
  5. Battery
  6. All related wiring and connections
  7. Powertrain Control Module (PCM)
CAUTION: Before performing any starter tests, the ignition and fuel systems must be disabled.
  1. To disable ignition and fuel systems, disconnect the Automatic Shutdown Relay (ASD). The ASD relay is located in the Power Distribution Center (PDC). Refer to the PDC cover for the proper relay location.