LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Chrysler
>>
2009
>>
Sebring Base, 2D Convertible, ED3
>>
Repair and Diagnosis
>>
Engine Performance
>>
Ignition System
>>
Ignition Control (Service Information)
>>
CAPACITOR, Ignition
>>
Installation
>>
2.0, 2.4L
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
2.0, 2.4L
Fig 1: Removing/Installing Ignition Capacitor - 2.0L/2.4L
Courtesy of CHRYSLER LLC
Install ignition coil capacitor (2) and bolt (3), tighten bolt to 10 N.m (88.5 ft. lbs.).
Connect electrical connector (1).
Connect the negative battery cable, tighten the nut to 5 N.m (45 in. lbs.).