Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| In-Line4 | | 6.1 | | A |
| Additional Procedure: VALVE: Grind Complete: |
| In-Line4, Where Air Cond interferes add | | 0.2 | 0.2 | A |
| In-Line4, Where Power Steering interferes add | | 0.2 | | A |
| w/100 Amp Alternator add | | 0.6 | | A |
| Where Air Cond interferes add | | 0.2 | 0.2 | A |
| Combination Procedure: ROCKER ARM ASSEMBLY: Overhaul: |
| Double Rocker,Both | | 1.5 | | B |
| Double Rocker,One | | 0.8 | | B |
| Single Rocker,One | | 0.5 | | B |
| Single Rocker,Two | | 0.9 | | B |