Grind Complete
WARNING: This page is about the ProMaster 3500 2D Cab Chassis, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Both Sides | 22.0 | A | ||
| Additional Procedure: VALVE: Grind Complete: | ||||
| Gas/Ethanol, Where Air Cond interferes add | 0.2 | A | ||