LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Eagle >> 1995 >> Summit DL >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.5L Eng,O.H.C.- SOHC6.3A
Additional Procedure: VALVE: Grind Complete:
Where Air Cond interferes add0.20.2A
Where Pwr Strg interferes add0.20.2A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
In-Line40.4B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A