Engine Assembly: Remove, Install, and Overhaul
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Automatic Trans | DOES NOT include Air Conditioning System recover, evacuate and recharge. | 24.9 | A | |
| Combination Procedure: AIR CONDITIONING SYSTEM: Complete Charge: Includes: Air Conditioning system recover, evacuate and recharge. | ||||
| w/R-1234yf Refrigerant | Includes: Perform Safety Pressurized Pre-Charge Leak Test. | 1.4 | B | |
| w/R-134a Refrigerant | 1.2 | B | ||