Removal & Installation
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Automatic Trans | Includes: R&I Engine and Transmission Assembly. DOES NOT include Air Conditioning System recover, evacuate and recharge. | 7.3 | C | |
| Combination Procedure: AIR CONDITIONING SYSTEM: Complete Charge: Includes: Air Conditioning system recover, evacuate and recharge. | ||||
| Automatic Trans, w/R-1234yf Refrigerant | Includes: Perform Safety Pressurized Pre-Charge Leak Test. | 1.4 | B | |
| Automatic Trans, w/R-134a Refrigerant | 1.2 | B | ||
| Combination Procedure: CRANKSHAFT MAIN OIL SEAL: Replace: | ||||
| Automatic Trans, Rear | Includes: R&I Oil Pan. | 1.3 | B | |
| Combination Procedure: DIFFERENTIAL OUTPUT SEAL: Replace: | ||||
| Automatic Trans, Axle Shaft Oil Seal,Each | 0.2 | B | ||
| Combination Procedure: FLYWHEEL: Remove & Install or Remove & Replace: | ||||
| Automatic Trans | 0.5 | C | ||
| Combination Procedure: INPUT SHAFT SEAL: Remove & Replace: | ||||
| Automatic Trans | 0.2 | B | ||
| Combination Procedure: TORQUE CONVERTER: Replace: | ||||
| Automatic Trans | 0.2 | C | ||
| Combination Procedure: TRANSAXLE ASSEMBLY: Replace: | ||||
| Automatic Trans | Includes: Programming. | 0.6 | C | |
| Combination Procedure: TRANSMISSION OIL PUMP: Replace: | ||||
| Automatic Trans | 0.7 | B | ||
| Combination Procedure: TRANSMISSION OIL PUMP SEAL: Replace: | ||||
| Automatic Trans | 0.4 | B | ||