Switch Monitor Test: Notes
SWITCH MONITOR TEST checks input signals from various switches to ECA. All switches must be tested individually. If one switch is left on while another is being tested, a false fault will be displayed. If all switches are okay, go to CIRCUIT TEST D10 , step 1).