Transmission Assembly: Remove, Install, and Overhaul
TRANS ID - 4R44E, 4R55E, 5R44E, 5R55E
Includes: Inspect and replace all necessary components, clean and check Converter, flush Converter and Oil Cooler Lines, adjust and road test.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 4WD | 14.4 | A | ||
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.3 | C | |||
| Combination Procedure: MAIN CONTROL VALVE BODY: Overhaul: | ||||
| 2.0 | 1.5 | A | ||