Removal & Installation
WARNING: This page is about the Econoline E150, 4.2 2, which is a different variant/trim than selected.
TRANS ID - AOD, AOD-E, AODE-W, AOT, FIOD, 4R70E, 4R70W, 4R75E, 4R75W
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 4.7 | 3.6 | C | ||
| Additional Procedure: TRANSMISSION ASSEMBLY: Removal & Installation: | ||||
| w/Multi-Piece Driveline add | 0.2 | 0.2 | C | |
| w/Trans Skid Plate add | 0.2 | 0.2 | C | |
| Combination Procedure: CONVERTER: Drain & Test: | ||||
| 0.5 | 0.5 | C | ||
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.3 | 0.3 | C | ||
| Combination Procedure: OIL COOLER LINES: Flush/Replace: | ||||
| 0.3 | 0.2 | C | ||
| Combination Procedure: OIL PUMP SEAL: Remove & Replace: | ||||
| Front | 0.1 | B | ||
| Combination Procedure: TRANS OIL PUMP: Overhaul: | ||||
| Front | 0.6 | B | ||
| Combination Procedure: TRANS OIL PUMP: Remove & Replace: | ||||
| Front | 0.4 | B | ||
| Combination Procedure: TRANS OIL PUMP BUSHINGS & SEAL: Remove & Replace: | ||||
| 0.2 | B | |||
| Combination Procedure: TRANSMISSION ASSEMBLY: Replace: | ||||
| 0.6 | C | |||