Transmission Assembly: Remove, Install, and Overhaul
WARNING: This page is about the Econoline E150, 4.2 2, which is a different variant/trim than selected.
TRANS ID - AOD, AOD-E, AODE-W, AOT, FIOD, 4R70E, 4R70W, 4R75E, 4R75W
Includes: Inspect and replace all necessary components, clean and check Converter, flush Converter and Oil Cooler Lines, adjust and road test.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 11.7 | A | |||
| Additional Procedure: TRANSMISSION ASSEMBLY: Remove, Install, and Overhaul: | ||||
| w/Multi-Piece Driveline add | 0.2 | 0.2 | A | |
| w/Trans Skid Plate add | 0.2 | 0.2 | A | |
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| 0.3 | C | |||
| Combination Procedure: MAIN CONTROL VALVE BODY: Overhaul: | ||||
| 1.6 | A | |||
| Combination Procedure: OIL COOLER LINES: Remove & Replace: | ||||
| 0.3 | 0.2 | C | ||