Transmission Assembly: Remove, Install, and Overhaul
TRANS ID - AOD, AOD-E, AODE-W, AOT, FIOD, 4R70E, 4R70W, 4R75E, 4R75W
Includes: Inspect and replace all necessary components, clean and check Converter, flush Converter and Oil Cooler Lines, adjust and road test.
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| 4WD | | 12.4 | | A |
| Additional Procedure: TRANSMISSION ASSEMBLY: Remove, Install, and Overhaul: |
| w/Trans Skid Plate add | | 0.2 | 0.2 | A |
| Combination Procedure: FLYWHEEL: Remove & Replace: |
| | 0.3 | | C |
| Combination Procedure: MAIN CONTROL VALVE BODY: Overhaul: |
| | 1.6 | | A |
| Combination Procedure: OIL COOLER LINES: Remove & Replace: |
| | 0.3 | 0.2 | C |