Connecting Rod Bearings: Remove & Replace
Includes: R&I Oil Pan.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| V8,Gas, Each Additional | 0.3 | A | ||
| V8,Gas, One | 2.1 | A | ||
| Additional Procedure: CONNECTING ROD BEARINGS: Remove & Replace: | ||||
| V8, Where Air Cond interferes add | 0.1 | A | ||
| w/Cruise Control add | 0.2 | A | ||
| w/Engine Oil Cooler add | 0.4 | A | ||
| Where Elect Eng System interferes add | 0.5 | A | ||
| Where Pwr Strg interferes add | 0.3 | A | ||