Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| G3500,V8,Gas,5.7L Eng | | 14.5 | 9.7 | A |
| Additional Procedure: VALVE: Grind Complete: |
| G3500,V8,5.7L Eng, Where Pwr Strg interferes add,Left Side or Both | | 0.3 | 0.3 | A |
| G3500,V8,Gas, Where Air Cond interferes add,One Side or Both | | 0.6 | 0.6 | A |
| Where Air Pump interferes add | | 0.2 | 0.2 | A |
| Where Cruise Control interferes add | | 0.2 | | A |
| Where Elect Eng System interferes add | | 0.5 | | A |
| Combination Procedure: ROCKER ARM STUD: Remove & Replace: |
| Each Additional | | 0.2 | | B |
| One | | 0.3 | | B |
| Combination Procedure: VALVE LIFTERS: Remove & Replace: |
| V8, All | | 0.5 | | B |
| Combination Procedure: VALVE LIFTERS (REMOVED): Clean: |
| Each Additional | | 0.1 | | B |
| One | | 0.2 | | B |