Installation Procedure
- Remove the replacement PCM from the packaging.
- Verify the service number in order to ensure the service number is the same number as the faulty PCM.
- Connect the PCM electrical connectors.
Tighten: Tighten the PCM electrical connectors screws to 8 N.m (71 lb in).
- Slide the PCM retainer into the PCM bracket slots.
- Pull the PCM retention bar into position.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
- Program the PCM. Refer to Control Module References in Computing/Integrating Systems.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.