LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> GMC >> 2023 >> Canyon AT4X >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Canyon AT4, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.7L EngDOES NOT include Air Conditioning System recover, evacuate and recharge.40.4A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
Where Skid Plate interferes add0.2A
Combination Procedure: THROTTLE BODY ASSEMBLY: Reset:
2.7L Eng, Throttle Body Idle Air Flow Compensation ResetIncludes: Additional time for use of scan tool to perform this procedure.0.2B