LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Geo >> 1990 >> Storm Base, Standard >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Grind Complete

WARNING: This page is about the Storm GSi, Automatic, F3A/MX1, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
O.H.C.- DOHC, w/Air CondNOTE: If necessary to remove Intake and Exhaust Manifolds prior to Cylinder Head removal, add 3.3 hours.7.4A
O.H.C.- DOHC, w/o Air CondNOTE: If necessary to remove Intake and Exhaust Manifolds prior to Cylinder Head removal, add 3.3 hours.7.2A
Additional Procedure: VALVE: Grind Complete:
Where Pwr Strg Interferes add0.3A