Engine Assembly: Remove, Install, and Overhaul
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters.
Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| w/Air Cond,16 Valve Eng | | 25.2 | | A |
| w/Air Cond,8 Valve Eng | | 24.0 | | A |
| w/o Air Cond,16 Valve Eng | | 24.2 | | A |
| w/o Air Cond,8 Valve Eng | | 23.0 | | A |