Installation Procedure
- Connect the pump motor connector (3) to the bottom of the EBCM.
- Install the EBCM (1) to the BPMV (4).
- Install the 6 retainers (2) which connect the EBCM to the BPMV.
Tighten: Tighten the retainers to 2.9 N.m (26 lb in).
- Connect the EBCM harness connector.
- Lower the vehicle.
- Turn the ignition switch to the RUN position. Do NOT start the engine.
- Perform the diagnostic system check. Refer to Diagnostic System Check - ABS .
NOTE:
Refer to Fastener Notice
.